
CITY ENGINEERING is responsible for overseeing scheduled work and issuing an electronic certificate under Article 30 of Law 4495/2017, provided that the requirements are met.
🔧 Work that may fall under Article 30:
- Interior painting and floor replacement.
- Replacement of window and door frames within the same opening.
- Maintenance and repair of installations.
- Exterior painting and plaster repairs without scaffolding.
Each case is evaluated based on the property, the scope of the work, and any specific restrictions in the area.
📋 What we handle:
✅ Review of available plans and property details.
✅ On-site inspection and documentation of the work.
✅ Verification of compliance with Article 30 and any required approvals.
✅ Preparing the application package and submitting it electronically via e-Permits, provided the requirements are met.
If the work requires a Small-Scale Construction Work Approval or a building permit, we’ll let you know before you begin.
📩 Send us the property’s location, a brief description of the work, and your cell phone number so we can schedule an inspection.
CITY ENGINEERING
First, the engineer. Then, the work.

