{"id":404387,"date":"2026-01-27T11:19:37","date_gmt":"2026-01-27T09:19:37","guid":{"rendered":"https:\/\/www.cityengineering.gr\/studies-licensing\/static-studies\/"},"modified":"2026-01-28T13:18:04","modified_gmt":"2026-01-28T11:18:04","slug":"static-studies","status":"publish","type":"page","link":"https:\/\/www.cityengineering.gr\/en\/services\/static-studies\/","title":{"rendered":"Static Studies"},"content":{"rendered":"<div class=\"wpb-content-wrapper\"><p>[vc_row css=&#8221;.vc_custom_1747478381100{margin-bottom: 50px !important;}&#8221;][vc_column][vc_custom_heading text=&#8221;Structural Studies in Attica \u2013 For Houses, Shops &amp; Unauthorized Buildings&#8221; font_container=&#8221;tag:h1|font_size:30|text_align:center&#8221; use_theme_fonts=&#8221;yes&#8221;][vc_column_text]<\/p>\n<div style=\"width: 1200px;\" class=\"wp-video\"><video class=\"wp-video-shortcode\" id=\"video-404387-1\" width=\"1200\" height=\"675\" autoplay preload=\"metadata\" controls=\"controls\"><source type=\"video\/mp4\" src=\"https:\/\/www.cityengineering.gr\/wp-content\/uploads\/2025\/05\/\u03a3\u03c4\u03b1\u03c4\u03b9\u03ba\u03ad\u03c2-\u039c\u03b5\u03bb\u03ad\u03c4\u03b5\u03c2_-\u0397-\u0392\u03ac\u03c3\u03b7-\u03b3\u03b9\u03b1-\u0395\u03c0\u03b9\u03c4\u03c5\u03c7\u03af\u03b1-VEED.mp4?_=1\" \/><a href=\"https:\/\/www.cityengineering.gr\/wp-content\/uploads\/2025\/05\/\u03a3\u03c4\u03b1\u03c4\u03b9\u03ba\u03ad\u03c2-\u039c\u03b5\u03bb\u03ad\u03c4\u03b5\u03c2_-\u0397-\u0392\u03ac\u03c3\u03b7-\u03b3\u03b9\u03b1-\u0395\u03c0\u03b9\u03c4\u03c5\u03c7\u03af\u03b1-VEED.mp4\">https:\/\/www.cityengineering.gr\/wp-content\/uploads\/2025\/05\/\u03a3\u03c4\u03b1\u03c4\u03b9\u03ba\u03ad\u03c2-\u039c\u03b5\u03bb\u03ad\u03c4\u03b5\u03c2_-\u0397-\u0392\u03ac\u03c3\u03b7-\u03b3\u03b9\u03b1-\u0395\u03c0\u03b9\u03c4\u03c5\u03c7\u03af\u03b1-VEED.mp4<\/a><\/video><\/div>\n<p>[\/vc_column_text][\/vc_column][\/vc_row][vc_row css=&#8221;.vc_custom_1646388642241{margin-bottom: 50px !important;}&#8221; el_class=&#8221;jit-title&#8221;][vc_column el_class=&#8221;jit-content&#8221;]<div class=\"dt-fancy-separator title-left h3-size\" style=\"width: 100%;\"><div class=\"dt-fancy-title\" style=\"color: #913123;\"><span class=\"separator-holder separator-left\" style=\"border-color: #913123;\"><\/span>What is a Structural Analysis?<span class=\"separator-holder separator-right\" style=\"border-color: #913123;\"><\/span><\/div><\/div>[vc_column_text]Structural analysis is one of the most fundamental and decisive stages of any construction or engineering project, as it concerns the <strong>safety and durability of a building<\/strong> against loads, earthquakes, and weather phenomena. Although it is usually associated with the construction of new buildings, it is equally necessary in many other situations in the daily life of a property owner. <img loading=\"lazy\" decoding=\"async\" class=\" wp-image-402808 alignright\" src=\"https:\/\/www.cityengineering.gr\/wp-content\/uploads\/2025\/05\/%CE%A3%CE%A4%CE%91%CE%A4%CE%99%CE%9A%CE%95%CE%A3-%CE%9C%CE%95-300x169.jpg\" alt=\"\" width=\"440\" height=\"248\" \/><\/p>\n<p>Structural analysis or structural adequacy concerns works such as:<br \/>\n\u2022 Construction of new residential or commercial buildings<br \/>\n\u2022 Renovations and modifications (e.g., demolition of walls, changes to facades)<br \/>\n\u2022 Construction or reinforcement of unauthorized structures that are being legalized<br \/>\n\u2022 Construction of balconies, canopies, or attics<br \/>\n\u2022 Repairs to damage (cracks, subsidence, wear and tear)<br \/>\n\u2022 Visual inspection of existing building before purchase\/sale<br \/>\n\u2022 Technical report for structural adequacy assessment (without extensive interventions)<\/p>\n<p>The structural study is prepared by a specialized civil engineer, using modern calculation and design programs, and may be accompanied by a technical report, drawings, and\/or a file for submission to public authorities.<\/p>\n<p>It is often necessary for:<\/p>\n<ul>\n<li>Issuance of a building permit permit<\/li>\n<li>Legalization of unauthorized buildings (Law 4495\/17)<\/li>\n<li>Participation in subsidized programs such as &#8220;Save Energy&#8221;<\/li>\n<li>Real estate transfer or insurance<\/li>\n<\/ul>\n<p>The static sufficiency of a building <strong>is not a luxury \u2013 it is a prerequisite for life inside a property with security and peace of mind. <\/strong><br \/>\nThe team of <strong>City Engineering<\/strong> undertakes every type static study or technical evaluation with responsibility, clarity and without unnecessary technical burdens for the owner.[\/vc_column_text][\/vc_column][\/vc_row][vc_row css=&#8221;.vc_custom_1646388642241{margin-bottom: 50px !important;}&#8221; el_class=&#8221;jit-title&#8221;][vc_column width=&#8221;1\/2&#8243; el_class=&#8221;jit-content&#8221;][vc_column_text]<\/p>\n<h3>\n<div class=\"hr-thin\"><\/div>\n<\/h3>\n<p style=\"text-align: center;\" align=\"center\"><span style=\"color: #4472c4;\"><i><span style=\"color: #808080;\"><span style=\"font-size: medium;\">Static studies are necessary in various cases that relate with the safety and the legality of buildings. <\/span><\/span><\/i><\/span><\/p>\n<h3>\n<div class=\"hr-thin\"><\/div>\n<\/h3>\n<p>[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/2&#8243;][vc_single_image image=&#8221;404383&#8243; img_size=&#8221;full&#8221; alignment=&#8221;center&#8221; style=&#8221;vc_box_rounded&#8221; el_class=&#8221;image-large&#8221;][\/vc_column][\/vc_row][vc_row css=&#8221;.vc_custom_1646388642241{margin-bottom: 50px !important;}&#8221; el_class=&#8221;jit-title&#8221;][vc_column el_class=&#8221;jit-content&#8221;][vc_raw_html css=&#8221;&#8221;]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[\/vc_raw_html][\/vc_column][\/vc_row][vc_row el_class=&#8221;jit-content&#8221;][vc_column]<div class=\"dt-fancy-separator title-left h3-size\" style=\"width: 100%;\"><div class=\"dt-fancy-title\" style=\"color: #913123;\"><span class=\"separator-holder separator-left\" style=\"border-color: #913123;\"><\/span>Where a Structural Study is Required \u2013 Detailed Case Analysis<span class=\"separator-holder separator-right\" style=\"border-color: #913123;\"><\/span><\/div><\/div>[vc_column_text]Structural analysis is essential in various cases related to the safety and legality of buildings.<\/p>\n<p>Below are the main cases where a structural study is required:[\/vc_column_text][vc_tta_accordion spacing=&#8221;5&#8243; gap=&#8221;5&#8243; active_section=&#8221;&#8221; collapsible_all=&#8221;true&#8221;][vc_tta_section title=&#8221;1. News Construction&#8221; tab_id=&#8221;1644845696353-d602affe-a7ce&#8221;][vc_column_text el_class=&#8221;check-mark-list&#8221;]For the construction of any new building (residential, commercial, warehouse, etc.), a complete structural study is required for the issuance of a building permit.[\/vc_column_text][\/vc_tta_section][vc_tta_section title=&#8221;2. Legalization of Unauthorized Structures&#8221; tab_id=&#8221;1644904253589-c220177f-8935&#8243;][vc_column_text]In cases of unauthorized constructions or additions subject to legalization procedures, a structural study is required to assess the load-bearing capacity of the building. <a href=\"https:\/\/www.deltaengineering.gr\/%CF%80%CF%8C%CF%84%CE%B5-%CE%B1%CF%80%CE%B1%CE%B9%CF%84%CE%B5%CE%AF%CF%84%CE%B1%CE%B9-%CE%BC%CE%B5%CE%BB%CE%AD%CF%84%CE%B7-%CF%83%CF%84%CE%B1%CF%84%CE%B9%CE%BA%CE%AE%CF%82-%CE%B5%CF%80%CE%AC%CF%81\/?utm_source=chatgpt.com\">deltaengineering.gr+1Citizen&#8217;s Guide+1<\/a>[\/vc_column_text][\/vc_tta_section][vc_tta_section title=&#8221;3. Change of Use of Building&#8221; tab_id=&#8221;1644904334130-797a4bf5-94ec&#8221;][vc_column_text]When the use of a building changes (e.g., from residential to commercial), a structural analysis is required to ensure that the building can support the new functional requirements.[\/vc_column_text][\/vc_tta_section][vc_tta_section title=&#8221;4. Renovation or Repair of Existing Building&#8221; tab_id=&#8221;1747478808616-3134d2e2-98a6&#8243;][vc_column_text]In cases of renovation or repair, especially when we intervene in the building&#8217;s load-bearing structure, a structural study is required to assess the existing situation and design the necessary reinforcements.[\/vc_column_text][\/vc_tta_section][vc_tta_section title=&#8221;5. Installation of Heavy Machinery or Equipment&#8221; tab_id=&#8221;1747478827206-cf95f55c-38fe&#8221;][vc_column_text]When heavy machinery or equipment is to be installed (e.g., in industrial buildings), a structural analysis is required to ensure that the building can withstand the additional loads.[\/vc_column_text][\/vc_tta_section][vc_tta_section title=&#8221;6. Transfer of Real Estate&#8221; tab_id=&#8221;1747478841266-83e41072-0ba6&#8243;][vc_column_text]In some cases, when transferring real estate, a structural study may be requested to assess the structural condition of the building.[\/vc_column_text][\/vc_tta_section][vc_tta_section title=&#8221;7. Participation in Energy Upgrade Programs&#8221; tab_id=&#8221;1747478855494-9a6359ad-6388&#8243;][vc_column_text]To join programs such as &#8220;Save Energy,&#8221; a structural study may be required, especially when interventions affecting the building&#8217;s load-bearing structure are planned.[\/vc_column_text][\/vc_tta_section][vc_tta_section title=&#8221;8. Demolition of Building&#8221; tab_id=&#8221;1747478870416-785f95a9-78ae&#8221;][vc_column_text]Before demolishing a building, a structural analysis is required to ensure the demolition process is carried out safely.[\/vc_column_text][\/vc_tta_section][\/vc_tta_accordion][vc_column_text]<\/p>\n<h3>\n<div class=\"hr-thin\"><\/div>\n<\/h3>\n<p style=\"text-align: center;\" align=\"center\"><span style=\"color: #4472c4;\"><i><span style=\"color: #808080;\"><span style=\"font-size: medium;\">Note: The requirement for a structural study may vary depending on the case and the applicable urban planning regulations. It is recommended to consult a qualified engineer to assess the requirements of each specific case. <\/span><\/span><\/i><\/span><\/p>\n<h3>\n<div class=\"hr-thin\"><\/div>\n<\/h3>\n<p>[\/vc_column_text][vc_raw_html css=&#8221;&#8221;]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[\/vc_raw_html][\/vc_column][\/vc_row][vc_row margin_top=&#8221;20px&#8221; margin_bottom=&#8221;20px&#8221; css=&#8221;.vc_custom_1646751548304{margin-bottom: 20px !important;}&#8221;][vc_column width=&#8221;1\/2&#8243;][vc_single_image image=&#8221;404384&#8243; img_size=&#8221;full&#8221; alignment=&#8221;center&#8221; style=&#8221;vc_box_rounded&#8221; el_class=&#8221;image-large&#8221;][\/vc_column][vc_column width=&#8221;1\/2&#8243;][vc_column_text]<\/p>\n<h3>\n<div class=\"hr-thin\"><\/div>\n<\/h3>\n<p style=\"text-align: center;\" align=\"center\"><span style=\"color: #4472c4;\"><i><span style=\"color: #808080;\"><span style=\"font-size: medium;\">CITY ENGINEERING offers B2B services to engineers.<br \/>\nOur company always stands by our colleagues, offering comprehensive and specialized services at special prices.<\/span><\/span><\/i><\/span><\/p>\n<h3>\n<div class=\"hr-thin\"><\/div>\n<\/h3>\n<p>[\/vc_column_text][\/vc_column][\/vc_row][vc_row margin_top=&#8221;20px&#8221; margin_bottom=&#8221;20px&#8221; css=&#8221;.vc_custom_1654128699918{margin-bottom: 20px !important;}&#8221;][vc_column]<div class=\"dt-fancy-separator title-left h3-size\" style=\"width: 100%;\"><div class=\"dt-fancy-title\" style=\"color: #913123;\"><span class=\"separator-holder separator-left\" style=\"border-color: #913123;\"><\/span>Why choose us for your structural design?<span class=\"separator-holder separator-right\" style=\"border-color: #913123;\"><\/span><\/div><\/div>[vc_column_text el_class=&#8221;jit-content&#8221;]<div class=\"gap\" style=\"line-height: 20px; height: 20px;\"><\/div>\n<p>A structural study is not just a set of drawings and calculations. It is the documentation that ensures your building is <strong>safe, reliable, and legal<\/strong>.<\/p>\n<p>From the initial autopsy to the final submission and approval, the process requires technical precision, experience, and knowledge of regulations.[\/vc_column_text][vc_column_text]By choosing<strong> City Engineering<\/strong>, you have a reliable partner by your side. And that&#8217;s because:[\/vc_column_text][\/vc_column][\/vc_row][vc_row margin_top=&#8221;20px&#8221; margin_bottom=&#8221;20px&#8221; css=&#8221;.vc_custom_1654127909884{margin-bottom: 20px !important;}&#8221; el_class=&#8221;jit-content&#8221;][vc_column][vc_tta_accordion spacing=&#8221;5&#8243; gap=&#8221;5&#8243; active_section=&#8221;&#8221; collapsible_all=&#8221;true&#8221;][vc_tta_section title=&#8221;1. Certified Civil Engineers with Specialization&#8221; tab_id=&#8221;1747480491135-8a1ff242-cc9e&#8221;][vc_column_text el_class=&#8221;check-mark-list&#8221;]Our team consists of engineers with many years of experience in structural studies for residences, apartment buildings, commercial spaces, and unauthorized structures. We always apply the applicable legislation (Eurocodes, NOK, Law 4495\/17) responsibly.[\/vc_column_text][\/vc_tta_section][vc_tta_section title=&#8221;2. Speed &amp; Coordination No Delay&#8221; tab_id=&#8221;1747480491185-eff958ae-7abf&#8221;][vc_column_text]We take full responsibility for the process \u2013 from the inspection to the submission to the town planning department or for legalization, with minimal involvement on the part of the client. We deliver documentation immediately and without delay.[\/vc_column_text][\/vc_tta_section][vc_tta_section title=&#8221;3. Services for All Needs&#8221; tab_id=&#8221;1747480491239-dd149824-dc86&#8243;][vc_column_text]We undertake:<br \/>\n\u2022 Complete structural studies for new buildings<br \/>\n\u2022 Structural adequacy studies for unauthorized buildings and renovations<br \/>\n\u2022 Technical reports\/visual inspections prior to sale or purchase<br \/>\n\u2022 Risk reports or insurance documentation[\/vc_column_text][\/vc_tta_section][vc_tta_section title=&#8221;4. Clear Costs &amp; Customized Solutions&#8221; tab_id=&#8221;1747480491464-306cba3e-5366&#8243;][vc_column_text]We do not follow ready-made price lists. Our offer is <strong>personalized<\/strong>, without any &#8220;fine print,&#8221; and is tailored to the square footage, the condition of the building, and the type of study. Affordable prices from <strong>\u20ac120 to \u20ac1,500+<\/strong>, depending on the project.[\/vc_column_text][\/vc_tta_section][vc_tta_section title=&#8221;5. Direct Communication &amp; Transparency&#8221; tab_id=&#8221;1747480491530-bd01f92f-259d&#8221;][vc_column_text]We explain <strong>in simple terms<\/strong> what we do and why. We keep you informed at every step of the process and answer all your questions clearly.[\/vc_column_text][\/vc_tta_section][vc_tta_section title=&#8221;6. Service Nationwide&#8221; tab_id=&#8221;1747480491580-786ce506-2c6e&#8221;][vc_column_text]We undertake projects throughout Greece \u2013 from Athens and Thessaloniki to islands and remote areas, with the option of on-site inspection or remote documentation, where permitted.[\/vc_column_text][\/vc_tta_section][vc_tta_section title=&#8221;7. Hundreds of Satisfied Customers&#8221; tab_id=&#8221;1747480491632-b739a6c6-7090&#8243;][vc_column_text]We have supported owners, contractors, technical offices, and brokers in dozens of structural engineering projects, with <strong>consistent quality <\/strong>and <strong>repeated collaborations<\/strong>.[\/vc_column_text][\/vc_tta_section][\/vc_tta_accordion][vc_column_text]<\/p>\n<h3>\n<div class=\"hr-thin\"><\/div>\n<\/h3>\n<p style=\"text-align: center;\" align=\"center\"><span style=\"color: #4472c4;\"><i><span style=\"color: #808080;\"><span style=\"font-size: medium;\">Have you ever considered how secure your property is? Contact us for a clear picture based on documentation, accountability, and transparency.<\/span><\/span><\/i><\/span><\/p>\n<h3>\n<div class=\"hr-thin\"><\/div>\n<\/h3>\n<p>[\/vc_column_text]<div class=\"dt-fancy-separator title-left h3-size\" style=\"width: 100%;\"><div class=\"dt-fancy-title\" style=\"color: #913123;\"><span class=\"separator-holder separator-left\" style=\"border-color: #913123;\"><\/span>What is the procedure for the Structural Study?<span class=\"separator-holder separator-right\" style=\"border-color: #913123;\"><\/span><\/div><\/div>[vc_column_text]<div class=\"gap\" style=\"line-height: 20px; height: 20px;\"><\/div>[\/vc_column_text][vc_column_text]The process of preparing a structural study is highly organized and designed to offer <strong>safety, clarity, and speed<\/strong> to the owner, whether it is a new construction or an existing property.<\/p>\n<p>We follow 6 clear steps:[\/vc_column_text][vc_column_text]<strong>1\ufe0f<\/strong><strong>\u20e3<\/strong> <strong>FREE ESTIMATE &amp; ADVICE<\/strong><\/p>\n<p>Once we receive your request, we will contact you immediately to discuss:<\/p>\n<ul>\n<li>What exactly do you need (construction study, legalization, report, etc.)?<\/li>\n<li>The location and characteristics of the property<\/li>\n<li>If required autopsy<br \/>\nWithin 24 hours we will send you a personalized offer for your case with a price for your case with a price for a7&gt; we will send you a personalized offer with no obligation.<\/li>\n<\/ul>\n<p><strong>2\ufe0f<\/strong><strong>\u20e3<\/strong><strong> INSPECTION &amp; CHECK OF THE CURRENT SITUATION SITUATION<\/strong><\/p>\n<p>Our engineer visits the site to:<\/p>\n<ul>\n<li>Visual inspection or detailed recording (depending on the case)<\/li>\n<li>Photographic documentation<\/li>\n<li>Recording any damage or arbitrary interventions<\/li>\n<li>Confirmation of titles and legal details<\/li>\n<\/ul>\n<p><strong>3\ufe0f\u20e3 <strong>COLLECTION OF DOCUMENTS<\/strong><\/strong> <img loading=\"lazy\" decoding=\"async\" class=\" wp-image-403066 alignright\" src=\"https:\/\/www.cityengineering.gr\/wp-content\/uploads\/2025\/08\/1-300x300.jpg\" alt=\"\" width=\"486\" height=\"486\" srcset=\"https:\/\/www.cityengineering.gr\/wp-content\/uploads\/2025\/08\/1-300x300.jpg 300w, https:\/\/www.cityengineering.gr\/wp-content\/uploads\/2025\/08\/1-150x150.jpg 150w, https:\/\/www.cityengineering.gr\/wp-content\/uploads\/2025\/08\/1-500x500.jpg 500w, https:\/\/www.cityengineering.gr\/wp-content\/uploads\/2025\/08\/1.jpg 553w\" sizes=\"auto, (max-width: 486px) 100vw, 486px\" \/><\/p>\n<p>We ask the customer:<\/p>\n<ul>\n<li>Title deed \/ contract<\/li>\n<li>Building permit or extract (if available)<\/li>\n<li>Owner&#8217;s ID or tax identification number<\/li>\n<li>In the case of unauthorized construction, engineer&#8217;s certificates<br \/>\nWe will take care of the rest.<\/li>\n<\/ul>\n<p><strong>4\ufe0f<\/strong><strong>\u20e3<\/strong><strong> PREPARATION OF STUDY &amp; TECHNICAL REPORT<\/strong><\/p>\n<p>Our team writes:<\/p>\n<ul>\n<li>Static calculation bearing organism<\/li>\n<li>Technical report on adequacy or reinforcement<\/li>\n<li>Plans and proposals for reinforcement (where necessary)<\/li>\n<li>Accompanying documents (for submission to the Town Planning Department, if required)<br \/>\nWe use specialized software and approved methodologies.<\/li>\n<\/ul>\n<p><strong>5\ufe0f<\/strong><strong>\u20e3<\/strong><strong> DELIVERY OF FILE &amp; OFFICIAL DOCUMENTATION<\/strong><\/p>\n<p>Once the study is complete:<\/p>\n<ul>\n<li>We provide you with a complete file in digital and printed form.<\/li>\n<li>If necessary, we submit it for approval or accompany it with a legalization application.<\/li>\n<li>We issue invoices and deliver receipts.<\/li>\n<\/ul>\n<p><strong>6\ufe0f<\/strong><strong>\u20e3<\/strong><strong> SUPPORT &amp; FURTHER COOPERATION (optional)<\/strong><\/p>\n<p>If you wish, we can take care of:<\/p>\n<ul>\n<li>Supervision of reinforcements or constructions<\/li>\n<li>Preparation of additional technical reports<\/li>\n<li>Participation in arbitrary files, Savings, or transfers<\/li>\n<li>Ongoing technical support for your property<\/li>\n<\/ul>\n<p>[\/vc_column_text][vc_raw_html css=&#8221;&#8221;]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[\/vc_raw_html][\/vc_column][\/vc_row][vc_row margin_top=&#8221;20px&#8221; margin_bottom=&#8221;20px&#8221; css=&#8221;.vc_custom_1654127909884{margin-bottom: 20px !important;}&#8221; el_class=&#8221;jit-content&#8221;][vc_column]<div class=\"dt-fancy-separator title-left h3-size\" style=\"width: 100%;\"><div class=\"dt-fancy-title\" style=\"color: #913123;\"><span class=\"separator-holder separator-left\" style=\"border-color: #913123;\"><\/span>Supporting Documents for Structural Analysis (Per Job)<span class=\"separator-holder separator-right\" style=\"border-color: #913123;\"><\/span><\/div><\/div>[vc_column_text]<div class=\"gap\" style=\"line-height: 20px; height: 20px;\"><\/div>[\/vc_column_text][vc_column_text]The correct and complete collection of supporting documents is a basic prerequisite for the proper preparation and evaluation of a static study or report. Below we list what is required, separated by role and task:[\/vc_column_text][vc_tta_accordion][vc_tta_section title=&#8221;Supporting documents from the Customer (for use by our office):&#8221; tab_id=&#8221;1756306838152-808f8b53-6551&#8243;][vc_column_text]<\/p>\n<ul>\n<li>Copy of title deed (contract)<\/li>\n<li>Copy of ID and tax identification number<\/li>\n<li>Copy of building permit (if available)<\/li>\n<li>Excerpt from the Land Registry or E9 (optional)<\/li>\n<li>Contact details and address of property<\/li>\n<li>Responsible statement for commissioning a study<\/li>\n<li>Consent of co-owners (in apartment buildings or common areas)<\/li>\n<\/ul>\n<p>[\/vc_column_text][\/vc_tta_section][vc_tta_section title=&#8221;Technical Documents for the Preparation of the Study (collected by us):&#8221; tab_id=&#8221;1756306838198-6a43403e-c14c&#8221;][vc_column_text]<\/p>\n<ul>\n<li>Photographic documentation of the property (after inspection)<\/li>\n<li>Technical report on static condition or adequacy<\/li>\n<li>Static calculations \/ load simulation (where required)<\/li>\n<li>Supporting structure designs (existing &amp; proposed)<\/li>\n<li>Dimensioning tables for structural elements<\/li>\n<li>Accompanying .pdf file for submission or Word file for legalization<\/li>\n<\/ul>\n<p>[\/vc_column_text][\/vc_tta_section][\/vc_tta_accordion][vc_column_text]<div class=\"gap\" style=\"line-height: 20px; height: 20px;\"><\/div>[\/vc_column_text]<div class=\"dt-fancy-separator title-left h3-size\" style=\"width: 100%;\"><div class=\"dt-fancy-title\" style=\"color: #913123;\"><span class=\"separator-holder separator-left\" style=\"border-color: #913123;\"><\/span>Special Supporting Documents Per Case:<span class=\"separator-holder separator-right\" style=\"border-color: #913123;\"><\/span><\/div><\/div>[vc_column_text]<div class=\"gap\" style=\"line-height: 20px; height: 20px;\"><\/div>[\/vc_column_text][vc_tta_accordion][vc_tta_section title=&#8221;New Construction&#8221; tab_id=&#8221;1756307584898-16787d87-4af4&#8243;][vc_column_text]<\/p>\n<ul>\n<li>Building permit in progress<\/li>\n<li>Topographic diagram<\/li>\n<li>Architectural study \/ floor plans<\/li>\n<li>Electrical and mechanical studies (for intersections)<\/li>\n<\/ul>\n<p>[\/vc_column_text][\/vc_tta_section][vc_tta_section title=&#8221;Existing Building \/ Unauthorized&#8221; tab_id=&#8221;1756307584997-4b427488-a291&#8243;][vc_column_text]<\/p>\n<ul>\n<li>Sketches or old drawings (if available)<\/li>\n<li>Declaration of arbitrariness (if already submitted)<\/li>\n<li>Energy certificate (in cases of renovation)<\/li>\n<\/ul>\n<p>[\/vc_column_text][\/vc_tta_section][vc_tta_section title=&#8221;Renovation or Remodeling&#8221; tab_id=&#8221;1756307718024-a5de09d6-5d74&#8243;][vc_column_text]<\/p>\n<ul>\n<li>Floor plan of existing and proposed situation<\/li>\n<li>Description of work (which walls are being removed, what is changing)<\/li>\n<li>Static assessment from the autopsy (for structural elements)<\/li>\n<\/ul>\n<p>[\/vc_column_text][\/vc_tta_section][vc_tta_section title=&#8221;Strengthening or Risk&#8221; tab_id=&#8221;1756307752920-b8153467-1707&#8243;][vc_column_text]<\/p>\n<ul>\n<li>Technical expert report (if available)<\/li>\n<li>Photos of damage\/cracks<\/li>\n<li>Report from previous earthquake (if any)<\/li>\n<li>Justification for the need for reinforcement (e.g., addition of load)<\/li>\n<\/ul>\n<p>[\/vc_column_text][\/vc_tta_section][vc_tta_section title=&#8221;Simple Technical Report \/ Visual Inspection&#8221; tab_id=&#8221;1756307807968-be7069e8-8134&#8243;][vc_column_text]<\/p>\n<ul>\n<li>No design requirements<\/li>\n<li>Only owner details, title, and access to the property<\/li>\n<li>The report is issued after an autopsy.<\/li>\n<\/ul>\n<p>[\/vc_column_text][\/vc_tta_section][vc_tta_section title=&#8221;For Submission to Authorities \/ Legalization&#8221; tab_id=&#8221;1756307841587-acfa985d-c0e3&#8243;][vc_column_text]<\/p>\n<ul>\n<li>Electronic building ID (if available)<\/li>\n<li>Arbitrary file (Law 4495\/17)<\/li>\n<li>Archaeological or SA approvals (if required)<\/li>\n<\/ul>\n<p>[\/vc_column_text][\/vc_tta_section][\/vc_tta_accordion][vc_column_text]<\/p>\n<h3>\n<div class=\"hr-thin\"><\/div>\n<\/h3>\n<p style=\"text-align: center;\" align=\"center\"><span style=\"color: #4472c4;\"><i><span style=\"color: #808080;\"><span style=\"font-size: medium;\">Note: The exact package of documents varies depending on the case. Our team will guide you step by step on how to gather the required documents without stress and delays.<br \/>\n<\/span><\/span><\/i><\/span><\/p>\n<h3>\n<div class=\"hr-thin\"><\/div>\n<\/h3>\n<p>[\/vc_column_text][vc_raw_html css=&#8221;&#8221;]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[\/vc_raw_html][\/vc_column][\/vc_row][vc_row][vc_column]<div class=\"dt-fancy-separator title-left h3-size\" style=\"width: 100%;\"><div class=\"dt-fancy-title\" style=\"color: #913123;\"><span class=\"separator-holder separator-left\" style=\"border-color: #913123;\"><\/span>Administrative Side \u2013 What our office undertakes<span class=\"separator-holder separator-right\" style=\"border-color: #913123;\"><\/span><\/div><\/div>[vc_column_text]<div class=\"gap\" style=\"line-height: 20px; height: 20px;\"><\/div>[\/vc_column_text][vc_row_inner][vc_column_inner width=&#8221;1\/2&#8243;][vc_column_text]The preparation of a static study or technical report is not only a matter of technical competence, but also <strong>proper management of procedures and the documents<\/strong>. At <strong>City Engineering<\/strong>, we take care of <strong>all the administrative and technical processing<\/strong>, so that you do not need to deal with bureaucratic details.<\/p>\n<p>We undertake:<\/p>\n<p>\u2022 The <strong>drafting of the structural study<\/strong>, technical reports, and all necessary accompanying documents<br \/>\n\u2022 The <strong>preparation of the file<\/strong> for use in services (e.g. YDOM, municipalities, transfers, unauthorized buildings)<br \/>\n\u2022 The <strong>submission of the file<\/strong> where required (e-Permits, electronic building identity, energy saving platforms, etc.)<br \/>\n\u2022 The <strong>issuance of fees or charges<\/strong>, if applicable<br \/>\n\u2022 <strong>Communication with the competent authorities<\/strong> (urban planning, TEE, TAS, etc.)<br \/>\n\u2022 <strong>Monitoring of the process until completion<\/strong>[\/vc_column_text][\/vc_column_inner][vc_column_inner width=&#8221;1\/2&#8243;][vc_single_image image=&#8221;404385&#8243; img_size=&#8221;large&#8221;][\/vc_column_inner][\/vc_row_inner][vc_column_text]<\/p>\n<h3>\n<div class=\"hr-thin\"><\/div>\n<\/h3>\n<p style=\"text-align: center;\" align=\"center\"><span style=\"color: #4472c4;\"><i><span style=\"color: #808080;\"><span style=\"font-size: medium;\">Important: Requirements may vary depending on the purpose of the study (new construction, unauthorized construction, legalization, transfer, etc.) and the project area. We examine each case individually and tailor the file with absolute precision to avoid delays and rejections. <\/span><\/span><\/i><\/span><\/p>\n<h3>\n<div class=\"hr-thin\"><\/div>\n<\/h3>\n<p>[\/vc_column_text][vc_raw_html css=&#8221;&#8221;]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[\/vc_raw_html][\/vc_column][\/vc_row][vc_row][vc_column]<div class=\"dt-fancy-separator title-left h3-size\" style=\"width: 100%;\"><div class=\"dt-fancy-title\" style=\"color: #913123;\"><span class=\"separator-holder separator-left\" style=\"border-color: #913123;\"><\/span>Price list for Static Study &amp; Technical Reports<span class=\"separator-holder separator-right\" style=\"border-color: #913123;\"><\/span><\/div><\/div>[vc_column_text]<div class=\"gap\" style=\"line-height: 20px; height: 20px;\"><\/div>[\/vc_column_text][vc_column_text]<strong>Final prices with no hidden fees \u2013 Guaranteed reliability and transparency.<\/strong><br \/>\n(Prices do not include 24% VAT)[\/vc_column_text][vc_column_text]<\/p>\n<table>\n<thead>\n<tr>\n<td><strong>Service<\/strong><\/td>\n<td><strong>Up to 100 sq. m.<\/strong><\/td>\n<td><strong>101\u2013200 sq. m.<\/strong><\/td>\n<td><strong>201\u2013400 sq. m.<\/strong><\/td>\n<td><strong>Over 400 sq. m.<\/strong><\/td>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Technical Report Static Sufficiency (for arbitrary \/ transfer)<\/td>\n<td>180 \u20ac<\/td>\n<td>220 \u20ac<\/td>\n<td>270 \u20ac<\/td>\n<td>upon offer<\/td>\n<\/tr>\n<tr>\n<td>Visual Inspection \/ Opinion Engineer (without calculations)<\/td>\n<td>120 \u20ac<\/td>\n<td>150 \u20ac<\/td>\n<td>\u2013<\/td>\n<td>\u2013<\/td>\n<\/tr>\n<tr>\n<td>Complete Static Study for New Construction<\/td>\n<td>400 \u20ac<\/td>\n<td>600 \u20ac<\/td>\n<td>850 \u20ac<\/td>\n<td>upon offer<\/td>\n<\/tr>\n<tr>\n<td>Study Reinforcement Existing Building<\/td>\n<td>350 \u20ac<\/td>\n<td>500 \u20ac<\/td>\n<td>700 \u20ac<\/td>\n<td>upon offer<\/td>\n<\/tr>\n<tr>\n<td>Static Study for Addition \/ Extension<\/td>\n<td>280 \u20ac<\/td>\n<td>400 \u20ac<\/td>\n<td>600 \u20ac<\/td>\n<td>upon offer<\/td>\n<\/tr>\n<tr>\n<td>Update old static study<\/td>\n<td>from 250 \u20ac<\/td>\n<td>\u2013<\/td>\n<td>\u2013<\/td>\n<td>\u2013<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>[\/vc_column_text][vc_column_text]<strong>The price includes:<img loading=\"lazy\" decoding=\"async\" class=\" wp-image-396760 alignright\" src=\"https:\/\/www.cityengineering.gr\/wp-content\/uploads\/2020\/06\/%CE%95%CE%A0%CE%91%CE%A1%CE%9A%CE%95%CE%99%CE%91-300x300.jpg\" alt=\"\" width=\"417\" height=\"417\" \/><\/strong><\/p>\n<p>\u2714\ufe0f On-site inspection of the property<br \/>\n\u2714\ufe0f Photographic documentation<br \/>\n\u2714\ufe0f Drafting of a technical report or complete study<br \/>\n\u2714 \ufe0f Deliverable in printed and electronic form (.pdf)<br \/>\n\u2714\ufe0f Consulting &amp; guidance for next steps (legalization, urban planning, transfer)<\/p>\n<p><strong>Optional Additional Services<\/strong><\/p>\n<table>\n<thead>\n<tr>\n<td><strong>Service<\/strong><\/td>\n<td><strong>Price from<\/strong><\/td>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Supervision of static works<\/td>\n<td>100 \u20ac<\/td>\n<\/tr>\n<tr>\n<td>Submission to platforms (e-Permits \/ arbitrary)<\/td>\n<td>80 \u20ac<\/td>\n<\/tr>\n<tr>\n<td>Participation in folder &#8220;Save Energy&#8221;<\/td>\n<td>150 \u20ac<\/td>\n<\/tr>\n<tr>\n<td>Compilation of accompanying drawings \/ floor plans<\/td>\n<td>from 50 \u20ac<\/td>\n<\/tr>\n<tr>\n<td>Static adequacy check for property purchase<\/td>\n<td>140 \u20ac<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><strong>Why our prices stand out:<\/strong><\/p>\n<ul>\n<li>20\u201330% more economical than the average market price of<br \/>\n\u2022 All prices are all-inclusive \u2013 no hidden charges<br \/>\n\u2022 \u2699\ufe0f Immediate service \u2013 the study is usually delivered within 3\u20135 business days<br \/>\n\u2022 Delivery of documentation and 100% legal process<br \/>\n\u2022 Responsible civil engineer for each file<\/li>\n<\/ul>\n<p>[\/vc_column_text][vc_raw_html css=&#8221;&#8221;]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[\/vc_raw_html][\/vc_column][\/vc_row][vc_row][vc_column]<div class=\"dt-fancy-separator title-left h3-size\" style=\"width: 100%;\"><div class=\"dt-fancy-title\" style=\"color: #913123;\"><span class=\"separator-holder separator-left\" style=\"border-color: #913123;\"><\/span>Frequently Asked Questions \u2013 Static Study<span class=\"separator-holder separator-right\" style=\"border-color: #913123;\"><\/span><\/div><\/div>[vc_column_text]<div class=\"gap\" style=\"line-height: 20px; height: 20px;\"><\/div>[\/vc_column_text][vc_tta_accordion active_section=&#8221;&#8221; collapsible_all=&#8221;true&#8221;][vc_tta_section title=&#8221;1. What is a static study?&#8221; tab_id=&#8221;1756308226202-2cc1b1b0-2f35&#8243;][vc_column_text]The static study ensures that a building or structure is structurally safe and resistant to loads, earthquakes, wind and other loads, based on modern regulations.[\/vc_column_text][\/vc_tta_section][vc_tta_section title=&#8221;2. When is a structural analysis required?&#8221; tab_id=&#8221;1756308226226-70a22ad0-befb&#8221;][vc_column_text]In cases of new buildings, legalization of unauthorized structures, additions, change of use, reinforcements, or when work is carried out on the load-bearing structure.[\/vc_column_text][\/vc_tta_section][vc_tta_section title=&#8221;3. Who can prepare a structural analysis?&#8221; tab_id=&#8221;1756308226253-df5933d3-f5fd&#8221;][vc_column_text]Only civil engineers with a degree, experience in load-bearing structures, and registration with the Technical Chamber of Greece.[\/vc_column_text][\/vc_tta_section][vc_tta_section title=&#8221;4. How much does a structural analysis cost?&#8221; tab_id=&#8221;1756308226277-4f131f73-6b4e&#8221;][vc_column_text]The cost ranges from \u20ac120 (for technical reports) to \u20ac1,500+ (for complete building studies), depending on the surface area and use.[\/vc_column_text][\/vc_tta_section][vc_tta_section title=&#8221;5. Is a structural study required for unauthorized construction?&#8221; tab_id=&#8221;1756308226305-9d187a62-fa36&#8243;][vc_column_text]Yes, a technical report on structural adequacy is usually required when the unauthorized building is subject to legalization under Law 4495\/17.[\/vc_column_text][\/vc_tta_section][vc_tta_section title=&#8221;6. How long does it take to issue a study?&#8221; tab_id=&#8221;1756308226338-cf46dbcb-d3a1&#8243;][vc_column_text]A technical report can be delivered within 3\u20135 business days, while complete studies require 7\u201315 days.[\/vc_column_text][\/vc_tta_section][vc_tta_section title=&#8221;7. What does a complete static study include?&#8221; tab_id=&#8221;1756308226364-6c8c10c0-ac55&#8243;][vc_column_text]Calculations, structural design plans, technical report, load tables, and all necessary documents for submission to the Building Control Authority or notary public.[\/vc_column_text][\/vc_tta_section][vc_tta_section title=&#8221;8. When is it necessary to study reinforcement?&#8221; tab_id=&#8221;1756308226392-8cc92642-1cbf&#8221;][vc_column_text]When cracks, subsidence, damage from earthquakes or age are detected, or when new loads are added (e.g., canopies, attics).[\/vc_column_text][\/vc_tta_section][vc_tta_section title=&#8221;9. Can I request only a technical report without calculations?&#8221; tab_id=&#8221;1756308226419-07326009-a733&#8243;][vc_column_text]Yes, in simple cases or for initial estimates, a summary report is provided without complete calculations.[\/vc_column_text][\/vc_tta_section][vc_tta_section title=&#8221;10. Is a static study required for the transfer of real estate?&#8221; tab_id=&#8221;1756308226447-0f6481a5-5ccd&#8221;][vc_column_text]It may be requested by a notary or buyer, especially in unauthorized or old buildings for safety and documentation purposes.[\/vc_column_text][\/vc_tta_section][vc_tta_section title=&#8221;11. Is an inspection by an engineer required?&#8221; tab_id=&#8221;1756308226472-2e3e091e-0586&#8243;][vc_column_text]Yes, a visit to the site is almost always required for photographic and technical documentation.[\/vc_column_text][\/vc_tta_section][vc_tta_section title=&#8221;12. Must I have a building permit in order to carry out a study?&#8221; tab_id=&#8221;1756308226502-e5baf2c3-5ea4&#8243;][vc_column_text]Not necessarily \u2013 the study can cover existing properties without a complete file. Just let us know what you have.[\/vc_column_text][\/vc_tta_section][vc_tta_section title=&#8221;13. What is the duration of validity of the study?&#8221; tab_id=&#8221;1756309511575-fc69cf0e-0efe&#8221;][vc_column_text]It has no expiration date, but if there are changes or alterations to the building, it may need to be re-inspected.[\/vc_column_text][\/vc_tta_section][vc_tta_section title=&#8221;14. Is it mandatory for the \u201cSave Energy\u201d?&#8221; tab_id=&#8221;1756309535075-7ea92871-d0f2&#8243;][vc_column_text]In cases of external insulation with scaffolding or reinforcement of the building, a technical report or certification of structural adequacy may be requested.[\/vc_column_text][\/vc_tta_section][vc_tta_section title=&#8221;15. Does the study cover professional spaces?&#8221; tab_id=&#8221;1756309557843-d0269eb4-532c&#8221;][vc_column_text]Yes, whether it is a shop, office, or workshop, the structural design is adapted to the use and requirements of the space.[\/vc_column_text][\/vc_tta_section][vc_tta_section title=&#8221;16. Is an invoice or receipt issued for the study?&#8221; tab_id=&#8221;1756309581062-21d130ba-6308&#8243;][vc_column_text]Yes, the process is 100% legal and accompanied by a service invoice.[\/vc_column_text][\/vc_tta_section][vc_tta_section title=&#8221;17. How is the study paid for?&#8221; tab_id=&#8221;1756309602826-4e8cda36-b69f&#8221;][vc_column_text]By deposit, bank transfer, or cash. A deposit is required, with the balance payable upon delivery.[\/vc_column_text][\/vc_tta_section][vc_tta_section title=&#8221;18. Do I need permission to do a static study?&#8221; tab_id=&#8221;1756309626577-afa83749-b2f3&#8243;][vc_column_text]No \u2013 the study does not constitute a permit. However, if it is submitted to the town planning department, it may accompany a building permit or legalization application.[\/vc_column_text][\/vc_tta_section][vc_tta_section title=&#8221;19. What is \u201cstatic adequacy\u201d?&#8221; tab_id=&#8221;1756309650845-b13b01fd-4b36&#8243;][vc_column_text]It is the ability of a building to withstand the loads specified by regulations without presenting any risks or failures.[\/vc_column_text][\/vc_tta_section][vc_tta_section title=&#8221;20. How do I start the process?&#8221; tab_id=&#8221;1756309679122-b72cb048-3570&#8243;][vc_column_text]Fill out our form or call us. We will guide you through about the documentation and we will start immediately, without any inconvenience.[\/vc_column_text][\/vc_tta_section][\/vc_tta_accordion][vc_raw_html css=&#8221;&#8221;]JTNDZGl2JTIwY2xhc3MlM0QlMjJjdGEtaml0JTIyJTNFJTBBJTNDZGl2JTNFJTNDcCUyMHN0eWxlJTNEJTIydGV4dC1hbGlnbiUzQWNlbnRlciUzQiUyMiUyMCUzRVJlcXVlc3QlMjB5b3VyJTIwcXVvdGUlMjB0b2RheSUyMGFuZCUyMHJlY2VpdmUlMjB0aGUlMjBkb2N1bWVudGF0aW9uJTIweW91JTIwbmVlZCUyMCVFMiU4MCU5MyUyMHF1aWNrbHklMkMlMjByZWxpYWJseSUyQyUyMGFuZCUyMHdpdGglMjBjbGVhciUyMHRlcm1zLiUyMCUzQ2ElMjBocmVmJTNEJTIydGVsJTNBJTJCMjEwOTgwMTk4MCUyMiUzRTIxMCUyMCVFMiU4MCU5MyUyMDk4MDE5ODAlM0MlMkZhJTNFJTNDJTJGcCUzRSUzQyUyRmRpdiUzRQ==[\/vc_raw_html][\/vc_column][\/vc_row][vc_row][vc_column]<div class=\"dt-fancy-separator title-left h3-size\" style=\"width: 100%;\"><div class=\"dt-fancy-title\" style=\"color: #913123;\"><span class=\"separator-holder separator-left\" style=\"border-color: #913123;\"><\/span>Some of our Projects \u2013 Structural Studies<span class=\"separator-holder separator-right\" style=\"border-color: #913123;\"><\/span><\/div><\/div>[vc_column_text]<div class=\"gap\" style=\"line-height: 20px; height: 20px;\"><\/div>[\/vc_column_text][vc_column_text]The trust of our customers and the experience of our team are reflected in dozens of static studies and technical reports that we have prepared with consistency and accuracy, both in Attica and the rest of Greece.<\/p>\n<p>We undertake projects for new constructions, renovations, legalizations, additions, and reinforcements of buildings\u2014with technical documentation, modern computing tools, and full compliance with regulations.<\/p>\n<p><strong>Indicative Projects:<\/strong><\/p>\n<ul>\n<li>Complete structural study for a 4-story apartment building with pilotis in Patisia \u2013 Building permit issued (2024)<\/li>\n<li>Technical report on structural adequacy for an unauthorized ground floor apartment in Agios Dimitrios (2023)<\/li>\n<li>Study for the reinforcement of an existing load-bearing structure in a residence in Oropos, due to subsidence (2023)<\/li>\n<li>Static condition report for the transfer of an old detached house in Kalamata (2024)<\/li>\n<li>Addition of a floor to a 1960 residence in Nea Filadelfia \u2013 foundation inspection &amp; new load-bearing structure (2023)<\/li>\n<li>Structural design and preliminary architectural design for tourist bungalows in Naxos (2022)<\/li>\n<li>Technical report for the legalization of a 35 m\u00b2 space on the roof of an apartment building in Thessaloniki (2023)<\/li>\n<li>Static adequacy analysis of a building in an earthquake-prone area of Thessaly (2021)<\/li>\n<\/ul>\n<p>\u2728 All our projects are accompanied by:<br \/>\n\u2714\ufe0f Documentation based on Eurocodes and applicable legislation<br \/>\n\u2714\ufe0f Digital and printed file<br \/>\n\u2714\ufe0f Continuous support until final approval or implementation<\/p>\n<p>Are you an owner, researcher, or investor? Contact us to view sample portfolios or request a quote for your own project.[\/vc_column_text][vc_raw_html css=&#8221;&#8221;]JTNDZGl2JTIwY2xhc3MlM0QlMjJjdGEtaml0JTIyJTNFJTBBJTNDZGl2JTNFJTNDcCUyMHN0eWxlJTNEJTIydGV4dC1hbGlnbiUzQWNlbnRlciUzQiUyMiUyMCUzRVJlcXVlc3QlMjB5b3VyJTIwcXVvdGUlMjB0b2RheSUyMGFuZCUyMHJlY2VpdmUlMjB0aGUlMjBkb2N1bWVudGF0aW9uJTIweW91JTIwbmVlZCUyMCVFMiU4MCU5MyUyMHF1aWNrbHklMkMlMjByZWxpYWJseSUyQyUyMGFuZCUyMHdpdGglMjBjbGVhciUyMHRlcm1zLiUyMCUzQ2ElMjBocmVmJTNEJTIydGVsJTNBJTJCMjEwOTgwMTk4MCUyMiUzRTIxMCUyMCVFMiU4MCU5MyUyMDk4MDE5ODAlM0MlMkZhJTNFJTNDJTJGcCUzRSUzQyUyRmRpdiUzRQ==[\/vc_raw_html][\/vc_column][\/vc_row][vc_row][vc_column]<div class=\"dt-fancy-separator title-left h3-size\" style=\"width: 100%;\"><div class=\"dt-fancy-title\" style=\"color: #913123;\"><span class=\"separator-holder separator-left\" style=\"border-color: #913123;\"><\/span>Some of our Clients \u2013 Structural Studies<span class=\"separator-holder separator-right\" style=\"border-color: #913123;\"><\/span><\/div><\/div>[vc_column_text]<div class=\"gap\" style=\"line-height: 20px; height: 20px;\"><\/div>[\/vc_column_text][vc_column_text]The structural safety of a building concerns everyone\u2014from individuals and investors to professionals and technical offices. The trust that dozens of customers throughout Greece place in us every year is the greatest confirmation of our work.<\/p>\n<p>We have undertaken studies, reports, and technical opinions on:<\/p>\n<p><strong> Individuals &amp; Property Owners<\/strong><\/p>\n<ul>\n<li>Owners of detached houses, holiday homes, and apartments<\/li>\n<li>New buyers requesting static adequacy checks before purchase<\/li>\n<li>Heirs who are required to prove the suitability of the building for transfer or renovation<\/li>\n<\/ul>\n<p><strong> Professionals &amp; Businesses<\/strong><\/p>\n<ul>\n<li>Owners of tourist properties &amp; Airbnb who need static documentation for legal security<\/li>\n<li>Business owners who are expanding or changing the use of their stores<\/li>\n<li>Small craft industries, warehouses &amp; logistics that add loads or equipment and require a new study<\/li>\n<\/ul>\n<p><strong> Organizations &amp; Partners<\/strong><\/p>\n<ul>\n<li>Apartment building managers requesting studies for common projects (ramps, elevators, etc.)<\/li>\n<li>Notaries &amp; lawyers requesting technical reports for transfers<\/li>\n<li>Architects and engineers who collaborate with us on subcontracted studies or documentation<\/li>\n<\/ul>\n<p>[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column]<div class=\"dt-fancy-separator title-left h3-size\" style=\"width: 100%;\"><div class=\"dt-fancy-title\" style=\"color: #913123;\"><span class=\"separator-holder separator-left\" style=\"border-color: #913123;\"><\/span>CONTACT US<span class=\"separator-holder separator-right\" style=\"border-color: #913123;\"><\/span><\/div><\/div>[vc_empty_space][vc_btn title=&#8221;CONTACT US&#8221; style=&#8221;custom&#8221; custom_background=&#8221;#913123&#8243; custom_text=&#8221;#ffffff&#8221; align=&#8221;center&#8221; i_icon_fontawesome=&#8221;fa fa-envelope&#8221; add_icon=&#8221;true&#8221; link=&#8221;url:https%3A%2F%2Fwww.cityengineering.gr%2Fprosfora%2F|&#8221;][\/vc_column][\/vc_row]<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>[vc_row css=&#8221;.vc_custom_1747478381100{margin-bottom: 50px !important;}&#8221;][vc_column][vc_custom_heading text=&#8221;Structural Studies in Attica \u2013 For Houses, Shops &amp; Unauthorized Buildings&#8221; font_container=&#8221;tag:h1|font_size:30|text_align:center&#8221; use_theme_fonts=&#8221;yes&#8221;][vc_column_text] [\/vc_column_text][\/vc_column][\/vc_row][vc_row css=&#8221;.vc_custom_1646388642241{margin-bottom: 50px !important;}&#8221; el_class=&#8221;jit-title&#8221;][vc_column el_class=&#8221;jit-content&#8221;][vc_column_text]Structural analysis is one of the most fundamental and decisive stages of any construction or engineering project, as it concerns the safety and durability of a building against loads, earthquakes, and weather phenomena.&hellip;<\/p>\n","protected":false},"author":13,"featured_media":404386,"parent":410479,"menu_order":3,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-404387","page","type-page","status-publish","has-post-thumbnail","hentry","description-off"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.cityengineering.gr\/en\/wp-json\/wp\/v2\/pages\/404387","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.cityengineering.gr\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.cityengineering.gr\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.cityengineering.gr\/en\/wp-json\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.cityengineering.gr\/en\/wp-json\/wp\/v2\/comments?post=404387"}],"version-history":[{"count":17,"href":"https:\/\/www.cityengineering.gr\/en\/wp-json\/wp\/v2\/pages\/404387\/revisions"}],"predecessor-version":[{"id":404830,"href":"https:\/\/www.cityengineering.gr\/en\/wp-json\/wp\/v2\/pages\/404387\/revisions\/404830"}],"up":[{"embeddable":true,"href":"https:\/\/www.cityengineering.gr\/en\/wp-json\/wp\/v2\/pages\/410479"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.cityengineering.gr\/en\/wp-json\/wp\/v2\/media\/404386"}],"wp:attachment":[{"href":"https:\/\/www.cityengineering.gr\/en\/wp-json\/wp\/v2\/media?parent=404387"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}